Rail extension snapshot
| Item | What it means |
|---|---|
| Children / older adults / luggage | 8 Aug day-of recheck: tonight's extension still needs two legs - rail first, then interchange to home. Do not treat the last departure as a target with slower walkers, bulky luggage or an airport connection; reach the interchange at least 30 minutes earlier and check normal airport-service timings separately. |
| NSL / EWL | The official notice confirms North-South and East-West Line extensions. The City Hall to Jurong East last train is 12.30am; use the full official table for other directions on departure day. |
| Circle Line | Marina Bay to HarbourFront: 11.57pm. HarbourFront to Marina Bay: 11.30pm. |
| Thomson-East Coast Line | Woodlands North to Bayshore: 12.00am. Bayshore to Woodlands North: 12.12am. |
| NEL / DTL | North East Line: HarbourFront to Punggol Coast at 12.30am; Punggol Coast to HarbourFront at 12.00am. Downtown Line: Bukit Panjang to Expo at 12.03am; Expo to Bukit Panjang at 12.04am. |
| Sengkang / Punggol LRT | The last Sengkang LRT leaves at 1.06am and the last Punggol LRT at 1.09am. Their extension differs from Bukit Panjang LRT. |
| Not extended | Bukit Panjang LRT and Changi Airport service are not extended. Airport or LRT connections must be planned against normal last-service times. |